Free transformer headroom
Reduce phase peaks that are hidden inside acceptable aggregate demand.

A point-in-time, coincident peak-load case. 48 homes. One 200 kVA transformer. Compare phase balancing and managed load at the same illustrative peak. This is not a daily load profile or measured street; peak duration, rebound and charging deadlines are not modelled.
Try Balance phases, then Reset and compare System-level with LV-level, phase-aware managed load. Hover over a home (or tap on touch) to change its phase or manage its load. Drag to rotate the street.
Virtual Copper gives low-voltage networks the phase intelligence to target flexibility, balance load and unlock existing transformer headroom.
VIRTUAL INFRASTRUCTURE
Reduce phase peaks that are hidden inside acceptable aggregate demand.
Turn hot water, EV charging and batteries into location-aware network resources.
Use operational intelligence before committing to copper, civil works or larger transformers.
Make phase-aware connection and reinforcement decisions as the LV network changes.
LOCATION MATTERS
A broad flexibility signal spreads the response across the network. Targeting the constrained phase concentrates relief where it is needed, while also reducing demand along its upstream path.
Select a substation, feeder, transformer or phase to apply 10 kW of flexibility. Try GXP, then the highlighted phase TX1437x. Select again to sample another response.
Illustrative network and response, not measured performance. The model holds delivered flexibility at 10 kW and varies its downstream distribution. Upstream benefits assume coincident demand reduction on the same network path; losses and operating limits are not modelled.
Open full diagram
THE LOCAL NETWORK
The fastest capacity upgrade may not be another transformer. It may be knowing how to use this one.
PARTNER WITH US
We are working with network, metering and control partners to prove phase-aware capacity management in the field.